Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   - 3.1. Engines 2F and 3F-E
      3.1.1. Technical characteristics
      3.1.2. Kinds of repair without engine dismantle
      3.1.3. Installation of the piston of 1st cylinder in ВМТ
      3.1.4. A cover of a head of cylinders
      3.1.5. A lateral cover of the mechanism timing
      3.1.6. Коромысла and bars of pushers
      3.1.7. Springs of valves, plates, маслосъемные caps
      3.1.8. Soaking up and final collectors
      3.1.9. A head of cylinders
      3.1.10. Pushers
      3.1.11. A pulley коленвала
      3.1.12. A forward epiploon коленвала
      3.1.13. A forward cover
      3.1.14. A cam-shaft and drive gear wheels
      3.1.15. A cam-shaft and support
      3.1.16. Replacement of bearings
      3.1.17. The oil pallet
      3.1.18. The oil pump
      3.1.19. A flywheel (a leading disk of the hydrotransformer)
      3.1.20. A back epiploon коленвала
      3.1.21. Suspension bracket and engine details
   + 3.2. The verhneklapannyj engine 1FZ-FE
   + 3.3. Dismantle and engine major repairs
   + 3.4. An engine electric equipment
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and a steering
+ 10. A body
+ 11. An electric equipment
+ 12. Electroschemes


122d58df

3.1.19. A flywheel (a leading disk of the hydrotransformer)

Removal

PERFORMANCE ORDER
1. Lift the car and establish on supports. Remove transmission (check point).
2. Check up and if necessary replace a check point epiploon (a sealing ring on automatic transmission).
3. Remove coupling (on a manual transmission).
4. Designate labels flywheel position rather коленвала.
5. Turn away flywheel bolts (a leading disk of the hydrotransformer). Fix a flywheel from проворачивания, having rested a screw-driver against a gear wreath.
6. Cautiously remove a flywheel (a leading disk of the hydrotransformer).

Installation

PERFORMANCE ORDER
1. Clear a flywheel, check up presence on a surface of traces of deep development, furrows from rivets, traces of burning out and scratches. Insignificant damages can be eliminated зачисткой a skin. Check up deformation of a plane of a flywheel.
2. Clear and check up a condition of a plane of a socket of a flywheel and коленвала. If it is revealed that the back epiploon коленвала springs a leak before establishing a flywheel (a leading disk of the hydrotransformer), an epiploon replace.
3. Establish a flywheel (a leading disk of the hydrotransformer) on коленвал. Combine the labels put at removal. Before заворачиванием bolts grease carvings with fixing structure. On a part of cars the flywheel is established on pins.
4. Fix a flywheel a screw-driver for a gear wreath and tighten bolts of fastening with the set moment. Tighten opposite bolts.
5. Further assemblage is carried out upside-down.