Toyota Land Cruiser
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
- 9. Suspension brackets and a steering
9.1. Technical characteristics
9.2. The stabilizer of a forward suspension bracket and the plug
9.3. Forward and back shock-absorbers
9.4. Springs and plugs
9.5. Springs of suspension brackets (а/м FJ80)
9.6. A cross-section bar (а/м FJ80)
9.7. Suspension bracket levers (а/м FJ80)
9.8. A rotary fist
9.9. A steering wheel
9.10. Steering draughts
9.11. A reducer
9.12. The hydraulic booster pump
9.13. Removal of air from the wheel hydraulic booster
9.14. Wheels and tyres
9.15. Corners of installation of forward wheels
+ 10. A body
+ 11. An electric equipment
+ 12. Electroschemes
|
FORWARD SUSPENSION BRACKET
Removal
PERFORMANCE ORDER |
The prevention For removal of springs the adaptation for their compression is required.
|
1. Lift redock of the car and remove forward wheels. |
2. Establish supports under a bridge beam. |
3. Disconnect from a beam of the bridge of draught of the stabilizer and shock-absorbers. |
4. Cautiously lower the bridge so that springs were completely stretched. |
|
5. Compress springs the adaptation. |
6. Remove springs. |
|
Installation
PERFORMANCE ORDER |
1. Check up a condition of springs, at detection of cracks or in case of spring corrosion replace. |
|
2. Compress a spring and establish in a place, having tracked correctness of installation of a spring () in the bottom cup (). |
3. Further installation is carried out upside-down. |
|
BACK SPRINGS
Removal
PERFORMANCE ORDER |
1. Lift a back part of the car and remove wheels. |
2. Establish supports under a bridge beam. |
3. Disconnect from a beam of the bridge arms of the stabilizer and shock-absorbers. |
4. Turn away a bolt of a cross-section bar and take a bar aside. |
|
5. Cautiously lower the bridge so that springs were completely stretched. Remove a spring, undertaken the bottom termination. |
6. Check up a condition of springs, at detection of cracks or in case of spring corrosion replace. |
|
Installation
PERFORMANCE ORDER |
1. Installation of back springs is carried out upside-down. |
2. Tighten all fastenings with the set moment. |
|
3. Track correctness of installation of springs. The bottom termination of a spring should rest against the cup terminator. |
|
|
|