Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and car operation



Toyota Land Cruiser
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   + 3.1. Engines 2F and 3F-E
   - 3.2. The verhneklapannyj engine 1FZ-FE
      3.2.1. Technical characteristics
      3.2.2. Kinds of repair without engine dismantle
      3.2.3. A cover of a head of cylinders
      3.2.4. A soaking up collector
      3.2.5. A final collector
      3.2.6. Cam-shafts and pushers
      3.2.7. A head of cylinders
      3.2.8. A cover of a chain drive of cam-shafts
      3.2.9. A forward epiploon коленвала
      3.2.10. The oil pallet
      3.2.11. The oil pump
      3.2.12. A flywheel (a leading disk of the hydrotransformer)
      3.2.13. A back epiploon коленвала
      3.2.14. Suspension bracket and engine details
   + 3.3. Dismantle and engine major repairs
   + 3.4. An engine electric equipment
+ 4. Systems of cooling, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and a steering
+ 10. A body
+ 11. An electric equipment
+ 12. Electroschemes


122d58df

3.2.4. A soaking up collector
THE GENERAL DATA

The prevention

If the collector is disconnected only for removal of a head of cylinders turn away bolts and take him aside, without disconnecting hoses and wires. Procedure of dismantle of a collector from the engine as separate detail is more low described.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Execute декомпрессию fuel system (subsection 5.2.2 see)
3. Designate and disconnect from a collector vacuum hoses.
4. Remove the case заслонки (subsection 5.2.9.2.1 see) and the levelling chamber (subsection 5.2.9.2.6 see).
5. Remove a comb of the distributor of fuel and an atomizer (subsection 5.2.9.2.5 see).
6. Designate and disconnect hoses from the valve recycling and from the modulating vacuum valve. Turn out from a collector a tube recycling.
7. Disconnect from a collector a wire on weight (the junction is specified by an arrow).
8. Turn away bolts and nuts (are specified by arrows) and remove a collector.

The prevention

Working from below the car disconnect скобы fastenings of wires, the bottom bolts and 2 nuts of fastening of pair steel tubes to a collector.



Installation

PERFORMANCE ORDER
1. Clear a collector, check up a condition of a demountable plane, if necessary прошлифуйте.
2. Establish a new lining, establish a collector and wrap bolts and nuts.
3. Tighten bolts and nuts in regular intervals, with the set moment, being displaced from the centre to periphery.
4. Establish other details upside-down.
5. Before engine start check up freedom of moving of a cable throttle заслонки.
6. Start the engine and be convinced of absence of a leak of a cooling liquid and tightness of vacuum connections.
7. Check up the car in road conditions.